expiry time
Only available for Logged-in member. Please login or register to access this information.Or use the Temporary User that we have provided to you via email.
Item codes | FW Released Date | Changes Information |
|---|---|---|
WSLRW-LSV-01; WSLRW-LSV-01-RN; WSLRW-LSV-02; WSLRW-LSV-08-RN | 29/08/2026 | """1.Improve LSV valve control, summarized as follows::
+Add the following valve control modes: Queue Schedule + Fail-Safe Mode, Repeat Mode, Always Open Mode, and Always Close Mode.
+The Fallback Valve Close function is available only in Queue Schedule and Fail-Safe Mode, or Repeat Mode. The valve is automatically closed if it remains open longer than the configured maximum open duration.
+Allow configuration of the number of valve control pulses.
+Monitor server connection loss for a configurable period and switch the control mode when Queue Schedule and Fail-Safe Mode is active.
2.Use CORE_CODE = LRWME, CORE_VERSION = 1F0713 and Upgrade the core to 2F0829 to add new features:
+Add epoch time synchronization from the network server.
+Check for loss of connection to the Network Server.
+Support downlink payloads of up to 11 bytes.
+Update the default values: ITEM_CODE = """"WSLRW-LSV-01"""", HW_CONFIG = 4, ME_CONFIG = 1""" |
1
QUICK INSTALLATION GUIDE
1.1 Introduction
WSLRW-LSV is a LoRaWAN Latching Solenoid Valve Controller to control external Latching Solenoid Valve. The ultra-low power design allows the Valve to run in 5 years with batteries (depending on configuration). The valve will transmit data in kilo-meters distance to the LoRaWAN gateway, any brand on the market.
This LoRaWAN Latching Solenoid Valve Controller valve is the best choice for an Irrigation System for a Garden, Smart Farm, or Hydroponic Farm. It can be used for FCU in HVAC or any water supply line in a Facility or Building.
How the sensor connect to system?

System components:
The end nodes are LoRaWAN Sensors or Actuators;
The Gateways are LoRaWAN Gateway or Base Station;
The Network Server can be SAAS or On-premise server;
The Application Server is the destination software users want to utilize the data from/ to LoRaWAN sensors/ actuators.
How to set up the LoRaWAN system? Please follow these steps:
Adding the Gateways to a Network server. Please refer to the manual of Gateway and Network Server software;
Adding the End nodes to the Network Server;
Configure the callback or data forwarding from the Network Server to the Application Software by MQTT or HTTPS. Please refer to the manual of the Network Server.
Once the payload is on the Application server, decode data from Payload. Please check Section 1.9 for the Payload document.
1.2 Application Notes
For Applications
Smart Irrigation, Water Supply System, Water Level Control, Oil Level Control
Notes
Voltage and Current Requirements: matches those of the solenoid valve.
Pulse Duration Control: generate precise pulse durations to reliably switch the valve states.
Polarity Reversal: polarity reversal to switch the valve between open and closed states.
Power Consumption: consume low energy for battery-operated device.
Environmental Compatibility: operate effectively under the environmental conditions.
Integration with Existing Systems: easily integrate with existing systems.
1.3 When does device send Uplink messages?
The device will send uplink messages in the following cases:
Case 1: After power-up in the 60s, the device will send the first message called START_UP. The payload will tell the user the HW version, FW version, and current configuration of the device.
Case 2: Then, in every interval time (pre-configured), for example, 30 minutes, it will send the message called CYCLIC_DATA. The payload will tell the user the following data like measured values, battery level, and alarm status...
To change the cycle of data sending, you can change the value of the parameter: CYCLIC_DATA_PERIOD.
Case 3: The device will send ALARM message immediately when the valve control command switches from OPEN to CLOSE and vice versa. The alarm uplink contains information of valve control command (OPEN/CLOSE), total remaining schedule in the schedule queue, command status, schedule status, schedule start time, power supply/battery level, valve status, total open time, total close time, and control voltage.
Case 4: During the commissioning, testing, or calibration sensor, the user can force the device to send the uplink message to get the data immediately. This message is called FORCE_DATA. The payload will provide data like raw measured value, scaled measured values, battery level, and alarm status... It can be forced by applying the magnet key on the reed switch in 1s.
Case 5: If users want to change the configuration immediately, they don't need to wait until the next cyclic data-sending message; instead, they can force the device to send a special uplink message so that the device can get the new downlink message. This uplink message is named PARAMETERS_UPDATE. It can be forced by applying the magnet key in more than 5s.
Case 6: In every interval time (pre-configured), for example, 24 hours, it will send the message called HEARTBEAT. The payload will tell the user the following data like hardware version, firmware version, current sensor configuration.
Case 7: If LNS_CHECK_MODE =1, it will send the confirmed uplink message called LNS_CHECK every 24 hours. This confirmed uplink message is a message where a LoRaWAN device is requesting a LoRaWAN network to confirm the reception of its message. If the device receives no confirmation message from LoraWAN network server, it will re-send the LNS_CHECK message every hour during 3 hours. After 4th hour, if the device still receives no confirmation message, it will reset itself to join the network server. The LNS_CHECK payload will tell the user the following data like hardware version, firmware version, current sensor configuration.
Case 8: When the downlink type 2 of the control schedule is sent from Network Server/Gateway to device, the device will automatically send the SCHEDULE_ACK uplink message to confirm the successful receipt of the control schedule.
Case 9: If the application/network server sends downlink 3 to check current value of a configuration parameter or sends downlink type 5 to change value of a configuration parameter, the device will send the CONFIG-CHECK uplink. The payload of CONFIG-CHECK uplink contains the result of the configuration changes/configuration check.
1.4 Default Configuration
The LSV has the default configuration, however, those parameters can be changed. The user can change the configuration on the wireless transmitter so that the complete sensor (transducer + wireless) delivers the proper output value. Please check the Payload document for more information.
1.5 Battery/ Power Supply
The controller uses below 2 types of batteries for LoRaWAN node and for pulse to control solenoid valve
1, Battery for LoRaWAN node
Battery type: Primary battery
Battery size and Voltage: AA 3.6 VDC
Number of batteries: 01
Recommended batteries: Saft LS14500, 2600 mAh, AA Lithium Thionyl Chloride 3.6 V Battery Non-Rechargeable

2, Battery for pulse to control external solenoid valve
Battery type: Primary battery
Battery size and Voltage: 522, 9 VDC
Number of batteries: 01
Recommended batteries: Energizer Max 522 6LF22 6AM6 9V 600 mAh

3, Battery installations
Remove 2 screws and take out the housing
Insert 2 types of the batteries to the holder, note the polarity when insert the batteries

Before battery installation

After battery installation
Re-install the housing
Note:
When re-installing the housing, pay attention to put the PCB edge into the middle guiding slot of the box inside as shown below)

4, Understanding the battery levels:
Level 3 (4 bars): battery energy is 60-99%
Level 2 (3 bars): battery energy is 30-60%
Level 1 (2 bars): battery energy is 10-30%
Level 0 (1 bar): battery energy is 0-10%
1.6 What's in the Package?

1.7 Guide for Quick Test
With the default configuration, the device can be connected quickly to the Network Server by the following steps.
Step 1: Prepare the values of communication settings
Frequency zone: Most of the sensor was configured the frequency zone to suit customer application before delivery
DevEUI: Get the DevEUI on the product nameplate
AppEUI Default value: 010203040506070809
AppKey : Read offline from device memory map or contact corresponding supplier/distributor/manufacturer to have this value. Each device has own AppKey value
Activation Mode: OTAA with local join server
Network Mode: Public
LoraWAN Protocol: version1.0.3
Class: A for sensor; C for actuator
If current basic common settings do not match with your region, network server/application, follow below instruction to change them as below:
NOTE: If the settings in above table are changed via downlink, the device MUST be reset to make the changed settings take effect. The reset is hard reset (Turn OFF external power supply, wait 3-7 minutes, and then turn ON external power supply OR take out battery, wait 3-7 minutes and then insert battery back ) OR soft reset via downlink 0. Downlink 0 hexadecimal value to reset device equal CURRENT_CONFIGURATION hexadecimal value in uplink but change the 15th value of the CURRENT_CONFIGURATION from 0 to A. For example, CURRENT_CONFIGURATION is 00C80064000B6000, the downlink 0 value for resetting device will be 00C80064000B60A0
For changing other settings, please refer to Section 3.2 Sensor configuration to change the other settings
Step 2: Register the device on the LoRaWAN network server
Input the above settings on your device registration page of the network server.
Note: Different network server software will have different device registration processes. Please refer to the manual of the network server software used for more details.
Please visit the below Section 1.10 to get the instructions for adding the LoRaWAN sensors to some common network servers such as Actility, TTN...
Step 3: Install the batteries to the device OR do power wiring and supply external power to the device if applicable
Please refer to Section 1.5 as above for instructions on battery installation OR for instructions to do power wiring and supply external power to the the device if applicable
After installing the battery in 60 seconds, the first data packet will be sent to the LoRaWAN gateway. After receiving the first data packet, the time of another packet depends on the value of the parameter: cycle_send_data. Additionally, you can use a magnet key to touch the magnetic switch point on the housing within 1 second to initiate force packet of the device to send data instantly and the LEDs on the housing will be lit with SKY BLUE color.
Step 4: Decode the payload of receiving package
Please refer to Section 1.9 Payload Document and Configuration Tables for details of decoding the receiving packet to get the measured values.
If the device has local display, measured values are shown on the local display
1.8 Installation
Dimension Drawings and Installation Gallery (Photos and Videos)


Please follow the checklist below for a successful installation:
1. Have you studied the dimensions of the device as above drawings?
2. Have you tested and make sure the device have been connected successfully as Section "1.7 Guide for Quick Test" above?
3. Have the device been configured properly as per Section 3.2 below?
4. Have the device been calibrated or validated as per Section 3.3 below?
5. Then you can start to install the device at site. Please check the following Installation Notes for Sensor Part (if available) before installation.
Installation Notes for Sensor Part (if available)
Installation Notes for Latching Solenoid Valve Controller
1. Preparation:
Power Supply: Ensure the power supply matches the voltage and current requirements of the solenoid valve.
Tools: Gather necessary tools such as a multimeter, screwdriver, wire strippers, and connectors.
2. Mounting:
Location: Choose a clean, dry, and accessible location for the controller.
Secure Mounting: Mount the controller securely using screws or brackets.
3. Electrical Connections:
Polarity: Ensure correct polarity for the electrical connections. Use an H-bridge circuit if needed for polarity reversal.
Wiring: Connect the controller to the solenoid valve using appropriate gauge wires. Secure connections with wire nuts or terminal blocks.
Power Supply: Connect the power supply to the controller, ensuring it is turned off during installation.
4. Configuration:
Pulse Duration: Set the pulse duration on the controller to match the requirements of the solenoid valve.
Programming: If using a programmable controller, configure it to send the correct pulse duration and polarity.
5. Testing:
Initial Test: Turn on the power supply and test the controller to ensure it switches the valve correctly.
Adjustments: Make any necessary adjustments to the pulse duration or configuration settings.
6. Final Checks:
Secure Connections: Double-check all electrical connections to ensure they are secure and properly insulated.
Environmental Conditions: Verify that the installation can withstand the expected environmental conditions (e.g., temperature, humidity).
7. Documentation:
Record Settings: Document the configuration settings and any adjustments made during installation.
Maintenance Schedule: Establish a maintenance schedule to periodically check the controller and valve for proper operation.
Installation Guide for Main Device
Check the Location for the best RF Signal
Make sure the site is good enough for RF signal transmission.
Tip: To maximize the transmission distance, the ideal condition is Line-of-sight (LOS) between the LoRaWAN sensor and the gateway. In real life, there may be no LOS condition. However, the LoRaWAN sensor still communicates with the gateway, but the distance will be reduced significantly.
DO NOT install the wireless sensor or its antenna inside a completed metallic box or housing because the RF signal can not pass through the metallic wall. The housing is made from Non-metallic materials like plastic, glass, wood, leather, concrete, and cement…is acceptable.
Install the Device on the Wall/Housing/Structure/valve body and connect to the external latching solenoid valve
Mount the sensor onto a wall/housing/structure with provided screws.

In some case, the controller is installed on the body of the external latching solenoid valve with provided U bracket

Connect the first wire (+ label) of the cable to (+) of external latching solenoid valve and connect the second wire (-label) of the cable to (-) of external latching solenoid valve. Below are example of connection to HUNTER solenoid valve and RAIN BIRD solenoid valve

Note:
Device batteries must be not available during installation and wiring.
1.9 Payload Document and Configuration Tables
Please click below button for:
-
Payload decoding of Uplink messages;
-
Payload encoding of Downlink messages;
-
Configuration Tables of device.
Note:
If the content of below web payload, memory map, and sample decoder could not be copied, please install the extension of "Enable Copy Paste - E.C.P" for Microsoft Edge and for Google Chrome.
1.10 How to connect device to Back-end/ Network Server/ Coordinator
Please find below the examples of adding Daviteq's LoRaWAN sensor to the following Network servers:
ThingPark Community (of Actility);
Things Stack (of The Things Network).
You can use the similar methods to add LoRaWAN sensors to other Network Server.
1. THINGPARK COMMUNITY (ACTILITY) NETWORK SERVER
1.1. Example to add the Tektelic LoraWAN gateway Model T0005204 to ThingPark Enterprise SaaS Community
1. Log in to your ThingPark Enterprise account via the link: https://community.thingpark.io/tpe/
2. Browse on the left panel to Base Stations, click the drop-down menu, then click Create.

3. Select the base station’s Tektelic.
※ If you do not find the Tektelic, click View More Manufacturers.

4. On the following screen, select the Model: Micro 8-channels from the drop-down list.

5. Fill the form as below table:
Input exactly as above Input field column, except Name field is user-defined and is different from the existing base station name on the network server.
After filling the registration form, click CREATE to complete adding the base station to the network server.
1.2. Add Daviteq's LoRaWAN devices to ThingPark Enterprise SaaS Community
ThingPark Enterprise supports all Classes of LoRaWAN® devices. By default, the sensor supports Over-the-Air Activation (OTAA) with a local Join Server that is programmed at the factory.
Manual provisioning of OTAA devices using a local Join Server. To learn more, see Activation modes.
1. At left panel of the screen of the Thingpark GUI, click Devices > Create from the dashboard.

2. Select the Generic supported by your device on your screen.

3. Select the Model of LoRanWAN 1.0.3 revA - class A with correct frequency plan

4. Fill the form as below table:
In addition to filling out the form, the option to select the connection between ThingPark and Daviteq application (Globiots).

After filling out the registration form, please click CREATE to add devices to the network server.
1.3. Send a downlink frame from Thingpark Network Server to the device
Follow the below steps to send the downlink frame from Thingpark Network Server to the device:
This functionality is active only when a connection is associated to the device (one of the color codes with a green bullet).
1. Navigate to the left panel, click the Devices' drop-down menu, then click List.

2. Browse the right side in the Devices, click the icon of the device and click Send Downlink.

3. Input the downlink code to the Payload field and input 1 to the Port field, and then click Validate.
The downlink data is added to the device downlink queue in network server. The downlink is sent after the network server receive an uplink from the device.

2. THINGS STACK (THE THINGS NETWORK) NETWORK SERVER
2.1. Add Sentrius LoraWAN gateway (Model RG19) to The things Stack network server
1. Log in to you’re The Things Stack account
2. Click the tab Gateways, click Add gateway button

3. Fill out the form as below table:
Input exactly as above Input column, except the Gateway Name field and the Gateway ID field is user-defined. It is different from the existing gateway name and gateway ID on the network server.
After filling the registration form, click Create gateway to complete adding the base station to the network server.

2.2. Add Daviteq's LoRaWAN device to The Things Stack network server
The Things Stack supports all Classes of LoRaWAN® devices. By default, the sensor supports Over-the-Air Activation (OTAA) with a local Join Server programmed at the factory.
1. Browse on the top panel, click the tab Application, and click Add application button to create an application

2. Fill in the information fields as user-defined, then select Create application

3. After the application is created successfully, select Add end device to register end device (LoRaWAN sensor)

4. Fill out the form as below table:
After filling out the registration form, please click the Register end device button to add the device to the network server.


2.3. Send a downlink frame from The Things Stack Network Server to the device
1. Select the device to send downlink
2. Input 1 to the FPort and input the downlink data in the payload field, and then tick Confirmed downlink and click Schedule downlink.

2
MAINTENANCE
2.1 Troubleshooting
Please find below steps to identify the problems from Communication Part or Sensor Part:
* If the device cannot connect to the Gateway or System or Co-ordinator at the first time, it is the Communication Problem;
* If the device status like battery, RSSI level, data status or other communication is normal, but the measured values are not updated or wrong, it would be the problems of Sensor part;
* If the data coming to gateway, system or co-ordinator is not frequently as expected, the problem would be Communication.
Please refer below the troubleshooting guide for Communication and Sensor Part.
Troubleshooting for Communication
Troubleshooting for Sensor Part (if available)
Here are some common issues and troubleshooting steps for latching solenoid valve controllers:
1. Valve Does Not Open or Close:
Check Power Supply: Ensure the power supply matches the voltage and current requirements.
Verify Pulse Duration: Make sure the pulse duration is sufficient to switch the valve state.
Polarity: Confirm the polarity of the pulses is correct.
Inspect Connections: Check all electrical connections for secure and proper wiring.
2. Valve Stays in One Position:
Pulse Strength: Ensure the pulse is strong enough to overcome any resistance.
Mechanical Blockage: Inspect the valve for any debris or mechanical blockage.
3. Inconsistent Operation:
Environmental Conditions: Verify the valve is operating within the specified temperature and humidity range.
Interference: Ensure there is no electromagnetic interference affecting the controller.
Component Wear: Inspect the valve and controller components for wear and tear.
4. No Response from Controller:
Power Supply: Check if the controller is receiving power.
Fuse or Circuit Breaker: Inspect and replace any blown fuses or tripped circuit breakers.
Controller Settings: Verify the controller settings and reprogram if necessary.
5. Valve Makes Unusual Noise:
Loose Components: Tighten any loose components or fittings.
Vibration: Secure the controller and valve to minimize vibrations.
Air in System: Bleed any air from the system to ensure smooth operation.
2.2 Maintenance
Maintenance for Main device
There is no requirement for maintenance of the Hardware of LoRaWAN latching solenoid valve controller
Maintenance for Sensor part (if available)
Maintenance of Latching Solenoid Valve Controllers
1. Regular Inspection:
Visual Check: Inspect the controller and valve for any signs of wear, damage, or corrosion.
Connections: Ensure all electrical connections are secure and free from corrosion.
2. Cleaning:
Valve Components: Clean the valve components, such as the plunger, seal, spring, and O-ring, to remove any dirt or debris.
Controller Housing: Keep the controller housing clean and free from dust.
3. Testing:
Functionality Test: Regularly test the valve to ensure it opens and closes correctly with the controller.
Pulse Duration: Verify the pulse duration settings to ensure they are optimal for reliable operation.
4. Environmental Conditions:
Temperature and Humidity: Check that the valve and controller are operating within the specified environmental conditions.
Protection: Ensure the installation is protected from extreme conditions that could affect performance.
5. Component Replacement:
Worn Parts: Replace any worn or damaged parts, such as seals or springs, to maintain optimal performance.
Coil Inspection: Inspect the coil for any signs of burnout or damage and replace if necessary.
6. Documentation:
Maintenance Records: Keep detailed records of all maintenance activities, including inspections, cleanings, tests, and replacements.
Settings: Document the controller settings and any adjustments made during maintenance.
7. Manufacturer Guidelines:
Follow Instructions: Adhere to the manufacturer's maintenance guidelines and recommendations for best results.
Support: Contact the manufacturer for support if you encounter persistent issues.
3
ADVANCED GUIDE
3.1 Principle of Operation
Principle of Operation for WSLRW LSV FW7
Daviteq LoRaWAN Latching Solenoid Valve Controller
Firmware 7F0829
This document describes valve control, scheduling, server connectivity supervision, time synchronization, reporting, and power-related behavior for WSLRW-LSV FW7. Configuration commands are introduced as Downlink (DL); numbered commands are written as Downlink 0, Downlink 2, Downlink 5, and Downlink 6.
What are the primary output values
Output field | FW7 meaning |
VALVE_CONTROL_COMMAND | Valve command; the examples use 1 for Open and 2 for Close. |
COUNTER_VALVE_OPEN | Valve opening count. Former name: NRS_COUNTER_ON. Not retained across restart or battery replacement. |
TIMER_VALVE_OPEN | Time the valve remains open, in seconds. Former name: NRS_TIMER_ON. Not retained across restart or battery replacement. |
VALVE_CONTROL_VOLTAGE | Valve control voltage reported in the Alarm examples. The source does not define its complete wire encoding. |
SCHEDULE_CONTROL_COMMAND | Queue command: Open or Close. Clearing all Queues is also described, but its numeric command code is not specified in the FW7 source. |
SCHEDULE_START_TIME | Configured Queue start time. A value of 0 requests immediate execution. |
SCHEDULE_TOGGLE_COMMAND_DURATION | Queue command duration; minimum 10 s. |
SCHEDULE_ORDINAL_NUMBER | Queue ordinal reported by the Schedule Ack uplink. |
TOTAL_SCHEDULE | Queue schedule count reported in uplinks; the device supports at most 15 Queues. |
SCHEDULE_START_TIME_FOR_QUEUE_AND_REPEAT | Start-time field used by Queue and Repeat reporting. |
SCHEDULE_STATUS_FOR_QUEUE | Queue status field reported in Alarm examples. Numeric status meanings are not defined in this source. |
What are the secondary output values
Output field | Purpose |
POWER_SUPPLY_LEVEL / POWER_SOURCE | Power-supply level and power source, as reported in the payload examples. |
ALERT_STATUS | Alarm status. The examples use 1 for an Open command and 2 for a Close command; no complete status list is supplied. |
VALVE_TYPE | Valve type; the supplied examples use 2. |
VALVE_CONTROL_MODE | 0: Queue Schedule with Fail-safe; 1: Repeat; 2: Always Open; 3: Always Close. |
RTC_SYNC_STATUS | RTC synchronization status, reported in Cyclic Data, Force, and Alarm uplinks. |
VALVE_POWER_LEVEL | Valve power level in the payload examples. |
VALVE_VOLT_LEVEL | Two-bit 9 V battery level, 0–3, described for Cyclic Data and Force uplinks. |
Clarification required. The source uses both VALVE_POWER_LEVEL and VALVE_VOLT_LEVEL. Their equivalence and the complete level-to-voltage mapping require confirmation. The FW7 source does not provide a complete output-field encoding specification.
Principle of operation
FW7 provides four valve control modes. Configure VALVE_CONTROL_MODE_CODE using Downlink 5 or a Modbus master on a PC. A mode change through Downlink 5 triggers an Alarm uplink to update the server. Reapplying Always Open or Always Close while already in either of these fixed-state modes also triggers an Alarm uplink.
Code | Control mode | Valve action on entry |
0 | Queue Schedule with Fail-safe Default mode | Close the valve, then run Queue control. |
1 | Repeat | Close the valve, then run Repeat control. |
2 | Always Open | Open the valve and keep it open. |
3 | Always Close | Close the valve and keep it closed. |
Device power on and reset
After battery installation, reset, or restart, the node checks the configured mode and performs the entry action above. The same entry actions apply when changing modes through Downlink 5.
NOTE:
Configure Repeat parameters through Downlink 6 before entering Repeat mode.
For restarted Queue and Repeat operation, the mode-entry Close action and the schedule recovery rules both apply. The delay and detailed ordering between initial valve actuation and schedule resumption are not specified. Reed-switch operating behavior is not defined by the FW7 source.
Scheduled control
Principle of scheduled control
In Queue Schedule with Fail-safe mode, the node executes Queue schedules while connected to the server. Periodic Heartbeat uplinks supervise connectivity. Once the configured consecutive Heartbeat failure criterion is met, the node runs Fail-safe control. Queue execution can continue during a connectivity outage before that criterion is met.
Queue schedules and Repeat settings are stored in EEPROM, not in the memory map. The remaining Queue list is saved to EEPROM after each Queue completes. Restart handling depends on the active mode and the schedule time, as described below.

Figure 1. Mode entry and schedule recovery. Separate from the fixed-state modes. T0–T2 are relative event markers, not elapsed-time values.
Configure the real time clock
The device uses an epoch offset from 1 January 2020 at 00:00:00 GMT+0. FW7 supports manual and automatic synchronization.
Manual synchronization
Write MANUAL_SYNC_E_TIME using Downlink 5. Device time equals the epoch origin plus MANUAL_SYNC_E_TIME seconds. A value of 0 sets RTC_SYNC_STATUS to Manual synchronization failed; a value greater than 0 sets it to Manual synchronization success. Numeric status codes for these manual outcomes are not supplied.

Figure 2. Manual time synchronization. The offset is in seconds from the 2020 origin. The status outcomes shown are names, not numeric RTC_SYNC_STATUS codes.
Automatic synchronization
Enable automatic synchronization with ENABLE_AUTO_SYNC_E_TIME = 1 using Downlink 5 or a Modbus command on a PC. After a Startup uplink, the node waits for the server response that updates epoch time. Once synchronization succeeds, the next request is triggered after the configured number N of Cyclic Data uplinks; the request is associated with the Nth uplink, after which the node waits for the response.
If synchronization fails, each Cyclic Data uplink carries a time synchronization request until a response succeeds. With auto sync enabled, the node places the LoRaWAN 1.0.3 DeviceTimeReq MAC command in the uplink header. The server returns DeviceTimeAns, described by the source as a port 0 Downlink whose payload is not visible to the application. Receipt updates the node RTC from server time.
Configuration or status | Meaning |
ENABLE_AUTO_SYNC_E_TIME = 1 | Enable auto sync; configurable through Downlink 5 or PC Modbus. |
TRIGGER_AUTO_SYNC_E_TIME = 144 | Configured number of Cyclic Data uplinks between requests after successful synchronization. |
RTC_SYNC_STATUS = 0 | No synchronization: neither manual nor auto synchronization has occurred. |
RTC_SYNC_STATUS = 1 | Auto synchronization success. |
RTC_SYNC_STATUS = 2 | Auto synchronization failed; weak signal is one possible cause stated in the source. |

Figure 3. Startup and counted synchronization requests. Spacing between Cyclic Data uplinks and response waiting duration: Unspecified. Intermediate uplink markers are schematic.

Figure 4. Retry after time synchronization failure. Retry cadence follows Cyclic Data uplinks. Their period and response timeout are Unspecified; no separate retry timer is defined.
Set up Queue control commands
Use Downlink 2 to configure up to 15 Queues. Each Queue contains a start time, a toggle-command duration of at least 10 s, and an Open or Close command. Start time 0 requests immediate execution. At capacity, adding a Queue removes a Queue using FIFO. Clearing all Queues while in Queue Schedule mode closes the valve.
Every Queue execution sends an Alarm uplink to report valve status. A Downlink 2 write returns its result in a Schedule Ack uplink. If a Queue schedule is invalid, that Queue is deleted and the result is reported in Schedule Ack.
Downlink 2 field | Constraint or behavior |
Schedule start time | 0: execute immediately; otherwise use the configured start time. |
Schedule toggle-command duration | Duration ≥ 10 s. |
Schedule command | Open or Close valve. |
Queue storage | EEPROM; not stored in the memory map. Maximum 15 Queues; FIFO removal when full. |

Figure 5. Queue command window. For a scheduled start. A start time of 0 requests immediate execution instead of the waiting window. Diagram scale is schematic.
Clarification required. The FW7 source does not explicitly define the valve command at normal Queue-duration completion, duration 0 behavior, duplicate-start handling, or whether start-time-0 commands bypass storage. These FW6 reference rules have not been imported. The diagram therefore shows a command window without inventing its end-state action.
Schedule acknowledgment example
Schedule Ack E 2 08141CB8 003C 3 1
Decoded: EVENT_ID = 14; SCHEDULE_CONTROL_COMMAND = 2; SCHEDULE_START_TIME = 135,535,800; SCHEDULE_TOGGLE_COMMAND_DURATION = 60; SCHEDULE_ORDINAL_NUMBER = 3; SCHEDULE_DOWNLINK_STATUS = 1.
The command is a Close command. The source gives the status value without defining the full Schedule Ack status enumeration. Full wire-format details are referenced to Global LSV-7, which is not supplied.
Example of multiple scheduled control
If a new Queue reaches its start time while another Queue is still executing, the old Queue is removed and the new Queue takes priority. The old Queue is not resumed. The schedule commands shown below are intentionally not assigned valve states because either Open or Close is allowed.

Figure 6. Overlapping Queue schedules. T1 occurs before A would finish. Configured start times and durations determine the windows; no numeric timestamps are assumed.
Queue recovery after reset or battery replacement
If a Queue is still within its execution period after reset, restart, or battery replacement, execute its remaining time. Remove expired Queues. The source adds an exception: if all Queues are in the past, execute the Queue whose start time is nearest the current time.

Figure 7. Restart during an active Queue. Resume only while the schedule remains active. Recovery time is Unspecified; the window is not shown restarting with a full duration.
Clarification required. The source first says expired Queues are removed, then says to execute the nearest-start Queue if all are expired. The selection order, execution duration, and final valve state for this exception require clarification. No timeline is assigned to that unresolved branch.
Queue execution and its Alarm uplink are also attempted during a server outage before the Heartbeat disconnection criterion is satisfied. In this case, the server does not receive the Alarm uplink.
Server connectivity and Fail safe control
Periodic Heartbeat uplinks are Confirmed by default. The server responds with an acknowledgment Downlink described as no data on port 0. The node counts consecutive unsuccessful Heartbeat cycles. A successful Heartbeat transmission with successful ACK reception confirms server connectivity.
Parameter | Configured default and purpose |
TYPE_HEARTBEAT_UPLINK | 1: Confirmed uplink, set with Downlink 5. |
HEARTBEAT_PERIOD | 0: a 1 h Heartbeat period, set with Downlink 0. |
LOST_HB_CYCLE_FOR_DISCON | 24 consecutive lost Heartbeat cycles, set with Downlink 5. |
FAILSAFE_OPEN_DURATION | 1,800 s (30 min), set with Downlink 5. |
FAILSAFE_PERIOD_W_PW | 86,400 s (24 h). Configure PASSWORD_FOR_SETTING first, then write the protected period through Downlink 5. |
Fail-safe control starts after the node determines loss of server connectivity according to LOST_HB_CYCLE_FOR_DISCON. Loss of connectivity alone does not prove that this cycle criterion has already been reached. This supervision applies to Queue Schedule with Fail-safe mode.

Figure 8. Heartbeat loss detection before Fail safe entry. *Fail-safe follows loss determination; implementation latency is Unspecified. Heartbeat cadence is 1 h by default. The omitted intermediate cycles are not drawn to scale.
Clarification required. The source does not define the ACK waiting timeout, retransmissions within one Heartbeat cycle, the first Heartbeat phase after link loss, or a separate network rejoin retry interval. Therefore, 24 lost hourly cycles are not represented as an exact 24 h delay from physical disconnection. The timeline boundary marks a logical trigger, not a guaranteed zero-delay valve actuation.
Fail safe execution and recovery
Fail-safe control opens the valve, then closes it when FAILSAFE_OPEN_DURATION expires. The valve-control cycle repeats with the configured FAILSAFE_PERIOD_W_PW, which defaults to 24 h and is password protected. After reset, restart, or battery replacement during Fail-safe operation, the node continues Fail-safe control if connectivity is still lost.

Figure 9. Fail safe valve cycle while disconnected. *The source specifies the period but does not resolve whether it is measured from Open or from Close. Band widths are schematic and do not assign that anchor.
Clarification required. On a Fail-safe restart, the source does not define whether the open duration or cycle phase is retained, resumed, or restarted. The source also does not specify periodic alarm repetition while remaining in Fail-safe mode. No such behavior is added.
The node returns to Queue Schedule behavior after a periodic Heartbeat succeeds and its server ACK is received successfully. Physical restoration of the link by itself is not the documented recovery criterion.

Figure 10. Connectivity restoration and qualified recovery. Wait to the periodic Heartbeat, ACK latency, and Queue handoff latency are Unspecified. No immediate valve-state change is inferred at T0 or T2.
The exact handling of an in-progress Fail-safe opening at reconnection is not defined. Queue selection after recovery follows the Queue rules; the unresolved all-expired exception remains subject to clarification.
Repeat scheduled control
Repeat mode alternates valve commands in recurring cycles. A configured start time lets different nodes use staggered cycles. Configure all Repeat parameters in one Downlink 6 command. Settings are stored in EEPROM, not in the memory map. Invalid settings are canceled and a Repeat Ack uplink reports the result.
To change a Repeat schedule, first switch to another mode, then write the new start time and durations, and finally enable Repeat mode again. If Repeat mode is enabled without a new configuration, the previous schedule is used. The first execution stores an operated-state flag; changing to another mode clears that flag.
Downlink 6 field | Behavior |
First command | Open or Close. |
Start time | 0: execute immediately; otherwise use the configured start time. |
Open duration | Configured Open interval; duration ≥ 10 s. |
Close duration | Configured Close interval; duration ≥ 10 s. |
Each valve-state change sends an Alarm uplink. Fallback protection is also available in Repeat mode; it uses the same open-duration rule described under Fallback control.

Figure 11. Repeat cycle with Open as the first command. Both configured durations are at least 10 s. With Close as first command, the initial interval is the Close interval. Diagram scale is schematic.
Repeat acknowledgment example
Repeat Ack C 1 0C8D16C8 00003C 00021C
Decoded: EVENT_ID = 12; REPEAT_DOWNLINK_STATUS = 0; REPEAT_FIRST_COMMAND = 1; REPEAT_START_TIME = 210,573,000; REPEAT_OPEN_DURATION = 60; REPEAT_CLOSE_DURATION = 540. These are example values, not defaults.
Complete Downlink 6 and Repeat Ack byte layouts and status enumerations are referenced to Global LSV-7, which is not supplied.
Repeat recovery after reset
If the node resets, restarts, or has its battery replaced during Repeat operation, it synchronizes time again and counts cycles to identify the current cycle. Valve control then follows the original schedule. This recovery does not define a new schedule origin.

Figure 12. Repeat recovery against the original schedule. Recovery delays and exact valve state during recovery are Unspecified. This timeline does not imply a complete new cycle after reset.
Clarification required. Time-sync failure behavior during Repeat restart, the exact recovery latency, and the interaction between the mode-entry Close action and current-cycle restoration are not specified. They must be confirmed before assigning exact valve transitions to reset timestamps.
Always Open control
Always Open maintains the valve Open and has no valve fallback function. Reapplying Always Open while already in this mode triggers an Alarm uplink to update the server. Mode value 2 identifies Always Open in the Alarm and Cyclic Data examples; command value 1 identifies Open.
Always Close control
Always Close maintains the valve Closed and has no valve fallback function. Reapplying Always Close while already in this mode triggers an Alarm uplink to update the server. Mode value 3 and command value 2 appear in the supplied Alarm and Cyclic Data examples.
Clarification required. The final narrative line of the source labels the Always Close Cyclic Data example as VALVE_CONTROL_MODE = 2, while its decoded values state 3. The mode definition and decoded value 3 are retained; the conflicting annotation requires confirmation. No payload bytes have been changed.
Fallback control
Fallback limits how long a valve can remain Open in Queue Schedule, Fail-safe, and Repeat operation. Set FALLBACK_PERIOD through Downlink 5. With FALLBACK_PERIOD = 0, the function is disabled; 0 is the documented default for Queue Schedule and Fail-safe control.
If elapsed Open time is greater than the configured FALLBACK_PERIOD, the node automatically closes the valve and triggers an Alarm uplink. The comparison is strictly greater than the threshold. Always Open and Always Close do not use this protection.

Figure 13. Fallback Open duration threshold. T1 = Open start + FALLBACK_PERIOD. T2 is the qualifying greater-than condition; polling resolution and actuation/report timing are Unspecified.
Clarification required. The source does not define what happens to an active Queue or Repeat schedule after fallback closes the valve, how fallback affects subsequent Fail-safe openings, or the priority if fallback and another scheduled event coincide. The timeline stops at the documented Close response.
Alarm and periodic reporting behavior
Alarm uplinks are triggered by a Downlink 5 mode change, the specified reapplication of a fixed-state mode, Queue execution, Repeat valve-state changes, and fallback closure. Schedule Ack and Repeat Ack report configuration results; these are distinct from the ACK used to qualify Heartbeat connectivity.
Cyclic Data, Force, and Alarm uplinks carry RTC_SYNC_STATUS. The source does not provide a Cyclic Data transmission period, a Force uplink trigger sequence, repeated alarm reporting intervals, or a general Downlink reception and processing deadline. Only the auto-sync MAC exchange is given a reception sequence. No additional timer or receive-window duration is assumed.
Uplink payload examples
The following payloads and decoded values are transcribed from the FW7 source. Spaces preserve its field grouping; single hexadecimal characters are not silently padded. These examples are not complete encoding specifications. Queue and Fail-safe share VALVE_CONTROL_MODE = 0.
Alarm uplinks
Queue / Fail-safe 4 0 B5 01 01 00 03 00000000 03
Repeat 4 0 B5 01 C9 00 03 00000000 00
Always Open 4 0 84 01 D1 00 34 00000000 00
Always Close 4 0 88 02 D9 00 33 00000000 00
Decoded field | Queue / Fail-safe | Repeat | Always Open | Always Close |
EVENT_ID | 4 | 4 | 4 | 4 |
TOTAL_SCHEDULE | 0 | 0 | 0 | 0 |
VALVE_TYPE | 2 | 2 | 2 | 2 |
POWER_SUPPLY_LEVEL | 3 | 3 | 0 | 0 |
VALVE_CONTROL_COMMAND | 1 | 1 | 1 | 2 |
POWER_SOURCE | 1 | 1 | 0 | 0 |
ALERT_STATUS | 1 | 1 | 1 | 2 |
VALVE_POWER_LEVEL | 0 | 3 | 3 | 3 |
VALVE_CONTROL_MODE | 0 | 1 | 2 | 3 |
RTC_SYNC_STATUS | 1 | 1 | 1 | 1 |
reserved8 | 0 | 0 | 0 | 0 |
VALVE_CONTROL_VOLTAGE | 0.3 | 0.3 | 5.2 | 5.1 |
SCHEDULE_START_TIME_FOR_QUEUE_AND_REPEAT | 0 | 0 | 0 | 0 |
SCHEDULE_STATUS_FOR_QUEUE | 3 | 0 | 0 | 0 |
VALVE_CONTROL_VOLTAGE values retain the source decoding, with decimal commas converted to decimal points for English notation. No additional scaling or units are inferred from the hexadecimal grouping.
Cyclic Data uplinks
Queue / Fail-safe 3 5 B9 00000003 00000165 01
Repeat 3 5 B9 00000003 00000165 C9
Always Open 3 0 84 00000002 0000006C D1
Always Close 3 0 88 00000001 00000045 D9
Decoded field | Queue / Fail-safe | Repeat | Always Open | Always Close |
EVENT_ID | 3 | 3 | 3 | 3 |
TOTAL_SCHEDULE | 5 | 5 | 0 | 0 |
VALVE_TYPE | 2 | 2 | 2 | 2 |
POWER_SUPPLY_LEVEL | 3 | 3 | 0 | 0 |
VALVE_CONTROL_COMMAND | 2 | 2 | 1 | 2 |
POWER_SOURCE | 1 | 1 | 0 | 0 |
COUNTER_VALVE_OPEN | 3 | 3 | 2 | 1 |
TIMER_VALVE_OPEN | 357 | 357 | 108 | 69 |
VALVE_POWER_LEVEL | 0 | 3 | 3 | 3 |
VALVE_CONTROL_MODE | 0 | 1 | 2 | 3 |
RTC_SYNC_STATUS | 1 | 1 | 1 | 1 |
EVENT_ID = 3 identifies Cyclic Data uplinks; EVENT_ID = 4 identifies Alarm uplinks. EVENT_ID = 14 identifies Schedule Ack and EVENT_ID = 12 identifies Repeat Ack. The supplied examples do not distinguish Queue Schedule from Fail-safe using VALVE_CONTROL_MODE alone.
LED indication
FW7 LED indication colors, flash timing, and command-status patterns are not specified in the firmware source. Confirm the FW7 indication specification before using LED behavior for commissioning or fault diagnosis.
Configuration for the latching solenoid valve controller
Valve pulse control
VALVE_CONTROL_PULSE_COUNT accepts 1–3 control pulses and defaults to 1. The documented interval between control pulses is fixed at 2 s. Configure pulse count and pulse width using VALVE_CONTROL_PULSE_COUNT, CONTROL_PULSE_WIDTH, and PW_FOR_CONTROL_PULSE_WIDTH.
If the first pulse has already operated the valve, later configured pulses consume additional battery energy but are stated not to endanger the hardware. The FW7 source does not specify a pulse-width value, pulse polarity, or a password-unlock duration for modifying pulse width.
Configuration | Value or purpose |
VALVE_CONTROL_PULSE_COUNT | 1–3; default 1. |
Inter-pulse interval | Fixed 2 s. |
CONTROL_PULSE_WIDTH | Configurable pulse width; default and range Unspecified in FW7 source. |
PW_FOR_CONTROL_PULSE_WIDTH | Associated pulse-width configuration parameter; unlock procedure and timing Unspecified. |

Figure 14. Multiple valve control pulses. *The source does not define whether 2 s is start-to-start or end-to-start. Placement in the gap is schematic; it does not establish an edge reference. Additional pulses depend on the configured count.
Clarification required. Confirm the pulse polarity, pulse-width limits and default, and protected-write procedure before configuring valve pulse timing.
Maintenance counters and timers
COUNTER_VALVE_OPEN counts valve openings in Open/Close operation. TIMER_VALVE_OPEN tracks the duration of the Open state in seconds. Both reset to 0 after node restart or battery replacement because their values are not retained. Preset the counter with INIT_VAL_FOR_COUNTER_VALVE_OPEN and INIT_COUNTER_ENABLE; preset the timer with INIT_VAL_FOR_TIMER_VALVE_OPEN and INIT_TIMER_ENABLE.
The source does not define enable-value encoding or the timing of preset application relative to restart. The legacy names are NRS_COUNTER_ON and NRS_TIMER_ON, respectively; they do not imply nonvolatile retention in FW7.
Power supply and regional radio settings
Since firmware 5F and hardware 3H, one 3.6 V AA SAFT LS14500 cell powers the node and one 9 V battery powers the valve. The source states approximately 50 mA maximum continuous current and a 250 mA pulse capability for 100 ms for the LS14500. For US915, AU915, and IN865 operation, keep ADR off and operate only at SF7.
Valve battery measurement and levels
FW7 measures the valve battery voltage in association with valve actuation. The source describes measurement when the first control pulse is applied, and also describes measuring after Open-valve drive stops. Measurement and 9 V Energizer L522 battery-capacity estimation share PA0 with the reed-switch input; the described hardware and firmware improvement supports voltage measurement together with Reed Switch 2 reading.
Threshold or output | Value and basis |
VALVE_CONTROL_BATTERY_VHIGH | 4.132 V; configurable for the selected 9 V battery type. |
VALVE_CONTROL_BATTERY_VLOW | 2.034 V; configurable for the selected 9 V battery type. |
Threshold basis | TC-030 diagram; defaults derived from a Panasonic Manganese 9 V battery tested with a BACCARA LSV. |
VALVE_VOLT_LEVEL | 2 bits, levels 0–3; added to Cyclic Data and Force uplinks. |

Figure 15. Battery measurement timing requiring clarification. The two tracks represent alternative source descriptions, not two confirmed measurements. T2 is a relative marker only; no result latency is assigned.
Clarification required. Confirm the exact voltage sample point, whether the two descriptions refer to one or multiple samples, and the processing delay. A periodic measurement interval is not specified. The four-level threshold mapping, hysteresis, and relation of VALVE_VOLT_LEVEL to VALVE_POWER_LEVEL also require confirmation.
Detailed payload and memory-map definitions are referenced in the source to Global LSV-7, and the voltage-threshold basis to TC-030. Those documents are not supplied; missing encodings, status enumerations, and timing definitions remain unassigned.
Principle of Operation of Sensor part (if available)
A latching valve controller works by using a brief electrical pulse to change the valve's state (open or closed). Once the state is changed, it remains in that position without needing continuous power. This is achieved through a mechanism involving a bi-stable solenoid.
Momentary Pulse Activation:
Electrical Pulse:
A short electrical pulse is used to change the state of the valve. This pulse can be either positive or negative, depending on whether you want to open or close the valve.
Polarity: The polarity of the pulse determines the direction of the magnetic field, which in turn changes the state of the valve.
Bi-stable Solenoid:
Solenoid Operation: The solenoid in a latching valve has two stable positions. When an electrical pulse is applied, it moves the solenoid to one of these positions.
Energy Efficiency: Since the solenoid only requires power during the transition between states, it is highly energy-efficient.
Components and Design
Coil Design:
Two-Way Coil: This design uses a single winding and changes the polarity of the current to move the solenoid.
Valve Mechanism:
Plunger and Pole Piece: The attractive force between the plunger and the pole piece is crucial for the valve's operation. The distance between these components (the valve's stroke) affects the efficiency of the valve.
Default Configuration Parameters of Sensor part (if available)
The LSV has the default configuration, however, those parameters can be changed. The user can change the configuration on the wireless transmitter so that the complete sensor (transducer + wireless) delivers the proper output value. Please check the Payload document for more information.
3.2 Configuration
How to configure the device?
Sensor configuration can be configured in 02 methods:
Method 1: Configuring via Downlink messages, port 1 (default).
Method 2: Configuring via Offline cable.
Step to access configuration port: Open housing by turning counter-clockwise 2 screws, then remove the anti-interference shield, the configuration port as below figure:

Note: The sensor is only active for offline configuration in the first 60 since power up
Which Parameters are configured?
Please check Part G in Section 1.9 Payload Documents above.
Please check the Part D & E in Section 1.9 Payload Documents above.
Method 1: Configuration via Downlink messages
Method 2: Configuration by Offline Cable
Please download the Configuration Template File of this sensor to be used in Step 4 below.
Instructions for offline configuration of the Daviteq LoRaWAN sensors. Please follow the following steps.
Note: The sensor is only active for offline configuration in the first 60 since power up by battery or plugging the configuration cable.
1. Prepare equipment and tools
The following items must be prepared for configuration.
A PC using the Windows OS (Windows 7 or above versions). The PC installed the COM port driver of the Modbus configuration cable (if needed). The driver is at link: Modbus Configuration Cable COM port driver for PC and the instruction to install the driver at link: How to install the driver.
A Modbus configuration cable
Tools to open the plastic housing of LoRaWAN sensors (L hex key or screwdriver)
2. Download and launch Daviteq Modbus configuration software
Click the link below to download Daviteq Modbus configuration software:
https://filerun.daviteq.com/wl/?id=yDOjE5d6kqFlGNVVlMdFg19Aad6aw0Hs
After downloading the software, unzip the file named: Daviteq Modbus Configuration.zip and then copy the extracted folder to the storage drive for long-term use.
Open the folder, double click on the file Daviteq Modbus Configuration Tool Version.exe to launch the software and the software interface as below:

Note: The software only runs on Microsoft Windows OS (Windows 7 and above).
3. Connect the cable and configure the sensor
Step 1:
Connect the PC to the sensor using the configuration cable.
- Use the configuration cable (Item code: TTL-LRW-USB-01).

- Connect the USB-A plug into the USB-A socket of the PC.

Step 2:
On the configuration software, choose the relevant Port (the USB port which is the cable plugged in) and set the BaudRate: 9600, Parity: none
Step 3:
Click Connect button to connect the software to the sensor. After successful connection, the Connected status will show on the software.

Step 4:
Import the configuration template file of the sensor (as above link) to the software: click menu File/ Import New and then browse the relevant sensor template file (csv file) and click Open to import the template file.
Note: The sensor is only active for configuration for 60 seconds since plugging the configuration cable or the power supply into the sensor.
Each sensor type has its own template file. Refer to the sensor's manual to download the correct file.
Step 5:
Open the housing of the sensor and quickly plug the connector of the configuration cable into sensor's modbus configuration port as below figure. After plugging the connector, the software will read the parameter values automatically.

Plug the cable connector into sensor's modbus configuration port. This port is located at a different location, depends on the sensor type
Note: If the sensor has SKU of WSLRWEX-PPS and hardware version 1 & 2, the sensor must be powered by batteries for configuration
Step 6:
Read the current value of the parameter with Modbus Function 3
At the relevant row of the parameter, check box 3 on column Func to read the value of the parameter. The read value is shown in VALUE ON MEMMAP column.

The sensor is only active for configuration for 60 seconds since plugging the configuration cable or the power supply into the sensor. After 60 seconds, the TIME_OUT text will show on EXCEPTION column of the software.
Step 7:
Write the new setting to the parameter with Modbus Function 16
Double click on the column VALUE TO WRITE of the parameter and input the new setting value of the parameter;
Uncheck the tick on the FC column of the parameter, click on the arrow, select 16 and then check on the FC column to write a new setting to the parameter. The WRITE_OK text will show on EXCEPTION column if the software successfully writes the setting.

Repeat Step 6 to read the setting of the parameter for double-checking.
Note: For some critical parameters of the sensor, the password in "password for setting" must be written before writing the new settings to these parameters.
Only read/ write registers are allowed to write.
The sensor is only active for configuration for 60 seconds since plugging the configuration cable or the power supply into the sensor. After 60 seconds, the TIME_OUT text will show on EXCEPTION column of the software.
4. Troubleshooting
3.3 Calibration/ Validation
How to force sensor to send data for calibration/ validation (if available)
Using the magnet key, the device can be triggered to send data to the gateway immediately.

Note:
Upon transmitting the data to the gateway using the magnetic key, the timer for the transmission time interval will be reset.
The minimum time interval between two manual triggers is 15 seconds. If the interval is less than 15 seconds, data transmission will not occur.

Calibration/ Validation sensor (if available)
Calibrating a latching solenoid valve controller involves several steps to ensure accurate and reliable operation. Here's a detailed guide to help you through the process:
Steps for Calibration
Initial Setup:
Power Supply: Ensure the power supply is stable and within the required voltage range for the solenoid valve.
Connections: Verify all electrical connections are secure and correctly configured.
Pulse Duration:
Determine Pulse Length: Identify the optimal pulse duration needed to switch the valve state. This is typically specified in the valve's datasheet.
Test Pulses: Apply test pulses of varying lengths to find the minimum duration that reliably switches the valve.
Polarity Check:
Correct Polarity: Ensure the polarity of the pulses is correct. A positive pulse should open the valve, and a negative pulse should close it (or vice versa, depending on the valve design).
Reverse Polarity: Test the reverse polarity to confirm the valve returns to its original state.
Controller Configuration:
Programming: If using a microcontroller, program it to send the correct pulse duration and polarity based on the desired valve state.
Testing and Adjustment:
Initial Tests: Conduct initial tests to ensure the valve responds correctly to the control signals.
Fine-Tuning: Adjust the pulse duration and timing as needed to achieve consistent operation.
Environmental Considerations:
Temperature and Humidity: Test the valve under different environmental conditions to ensure reliable performance.
Load Conditions: Verify the valve operates correctly under varying load conditions (e.g., different pressures or flow rates).
Tools and Equipment
Oscilloscope: To measure the pulse duration and verify the signal integrity.
Multimeter: To check the voltage and current levels.
Power Supply: Adjustable power supply to provide the necessary voltage for testing.
Microcontroller or Timer Circuit: To generate the control pulses.
4
PRODUCT SPECIFICATIONS
4.1 Specifications
Spec
5
WARRANTY & SUPPORT
5.1 Warranty
Warranty
Below terms and conditions are applied for products manufactured and supplied by Daviteq Technologies Inc.
Free Warranty Conditions
The manufacturer undertakes to guarantee within 12 months from shipment date.
Product failed due to defects in material or workmanship.
Serial number, label, warranty stamp remains intact (not purged, detected, edited, scraped, tore, blurry, spotty, or pasted on top by certain items).
During the warranty period, if any problem of damage occurs due to technical manufacturing, please notify our Support Center for free warranty consultancy. Unauthorized treatments and modifications are not allowed.
Product failed due to the defects from the manufacturer, depending on the actual situation, Daviteq will consider replacement or repairs.
Note: One way shipping cost to the Return center shall be paid by Customers.
Paid Warranty
The warranty period has expired.
The product is not manufactured by Daviteq.
Product failed due to damage caused by disasters such as fire, flood, lightning or explosion, etc.
Product damaged during shipment.
Product damaged due to faulty installation, usage, or power supply.
Product damage caused by the customer.
Product rusted, stained by effects of the environment or due to vandalism, liquid (acids, chemicals, etc.)
Product damage is caused by unauthorized treatments and modifications.
Note: Customers will be subjected to all repairing expenses and 2-way shipping costs. If arises disagreement with the company's determining faults, both parties will have a third party inspection appraise such damage and its decision be and is the final decision.
5.2 Support
Support via Help center
If you need our support for Daviteq device's installation, configuration, test, and decode, please input support request at link: https://forms.cloud.microsoft/r/Kv2GpY7ZvQ
Our support engineer will contact you via email or the support ticket system.
If you have any questions about the product, you can search for information on our web (https://www.iot.daviteq.com/). If you can't find the right information, please register an account and send us a request at link Contact us | Daviteq Technologies . We will respond within 24 hours.